Services · St. George & Southern Utah

New Construction HVAC

§ 01 — The Work
NEW CONSTRUCTION

Built in from
the ground up.

Building in St. George, Washington, or Hurricane? We work directly with builders and homeowners from plan review through final trim-out, on your build's timeline, not around it.

Southern Utah's new-construction market moves fast — we schedule rough-in and trim-out visits around your framing and inspection windows so HVAC never becomes the thing holding up the walk-through.

Plan review & load calcRough-in & trim-outBuilder & spec-home pricingCode-compliant, permitted installCoordinated with your build schedule0% APR financing available
Rooftop HVAC package unit being installed on a new-construction home in Southern Utah
New Build Install
ROOFTOP PACKAGE UNIT · SOUTHERN UTAH
One-Hour Windows
On time, guaranteed
No Salespeople
No pushy upsells, ever
$0 Trip Fee
You only pay for the work
§ 02 — Why It Matters

Planned early,
inspected once.

Duct runs, equipment placement, and electrical needs are far cheaper to get right on paper than to fix after drywall. We review plans and run the load calculation before framing, so the HVAC scope is locked in before it can become a change order.

Every new-construction install still gets a proper permit and code-compliant inspection — builder pricing doesn't mean cut corners, and a passed inspection on the first visit keeps your closing date on track.

Contractor inspecting a supply vent register in a newly built Southern Utah home
Trim-Out Inspection
SUPPLY VENT · NEW BUILD
§ 03 — Questions

New construction,
answered.

What builders and homeowners ask before breaking ground.

Yes — we partner with builders and GCs across St. George, Washington, and Hurricane's growing subdivisions, from single spec homes to multi-lot developments, and coordinate rough-in and trim-out around your build schedule, not around ours.
Yes. We'll review floor plans and do a load calculation before the framing stage so ductwork, equipment location, and electrical needs are locked in early — it's far cheaper to change a duct run on paper than after drywall.
We offer builder and spec-home pricing structured around your build volume and timeline. Every job still gets a proper load calculation and code-compliant, permitted install — we don't cut corners because it's new construction.
Rough-in typically happens alongside framing and before drywall, with trim-out and equipment startup closer to closing. We coordinate both visits directly with your site super so there's no scheduling gap holding up inspection.
§ 05 — Free Estimate

Ready to get
started?

Fill the form or call us — same-day callbacks before 6pm. Quote in 48 hours, install scheduled within a week for most jobs. It's about time.

FORM · REQUEST FOR QUOTE RFQ-2026-0428
No spam · No bots · A human calls back